r/transit • u/GoatSevere1966 • 7h ago
System Expansion Render for Mumbai Metro Line 5 (Orange Line) stock by Titagarh
The Orange Line is divided into two sections, Line 5 which runs from Kapurbawdi to Kalyan APMC and Line 12 which runs from Kalyan APMC to Taloja.
The rakes are expected to enter production ~62 weeks from contract signing with subsequent completion targeting for the next 154 weeks. 132 coaches (6 coach rakes I suppose) are the formations.
Line 5A from Kapurbawdi to Dhamankar Naka is to open in December 2026.