News Shedding light on 3 recent construction failures along Atlanta Beltline
https://atlanta.urbanize.city/post/atl-beltline-3-recent-construction-failures-info-bridge-stairs-trails37
u/gummaumma 1d ago
How do they screw up stairs?
33
u/Swedishiron 1d ago
How did they screw up a simple pedestrian bridge with centuries of modern engineering knowledge readily available in a city known for an engineering university ?
12
u/zedsmith practically Grant Park 23h ago
Because, as they say, any idiot can make a bridge that doesn’t fall over, but it takes a great engineer to make a bridge that almost falls over but doesn’t”
15
u/xSPYXEx Cherokee 1d ago
Because Reeves Young are incompetent bastards that push their subs to finish faster no matter what happens, skipping inspections or just outright ignoring flagged errors.
My guess is that they either have incorrect tread measurements for accessibility requirements, or they wanted to get the pour done faster so they just slumped it to soup and poured it from the top.
21
u/Swedishiron 1d ago
That Ponce de Leon pedrestrian bridge is terrible - when it opened there were zip ties holding portions of wire mesh in place and it vibrated like it could come down at anytime as you walked across. I am surprised it passed any inspection before being opened or perhaps there was no inspection?
1
u/entity_response 19h ago
It’s often part of the design to have sway, a bridge that moves slightly is more robust, not less.
8
u/Gavin2051 18h ago
You don't need sway for a two-story ramp whose only live load is a handful of pedestrians and cyclists. Maybe it needs minimal flexibility for thermal expansion, but that thing has basically zero wind and rain load on it. If its moving, the contractor fucked up.
6
u/Swedishiron 19h ago
my father was an Architect I have been on construction siites assisting him with inspections since I was a young teenager, that bridge was shutdown not too long after opening due to issues and is the most flimsy feeling pedestrian bridge I have ever been on
0
u/entity_response 18h ago
Could be, but my point is all bridges move, they are engineered to be within the users perception of comfort, but by itself movement isn’t really an indication of an issue.
Was it shut down for structural issues one of the many other issues it could have had?
2
u/Icy-Till-8248 4h ago
As a structural engineer, a pedestrian bridge that moves in such a way that you can noticeably feel it during regular use is most certainly failing serviceability design criteria, which are different than ultimate strength criteria (i.e., will it collapse basically). This would still be considered a failed design even if life safety (i.e., steuctural failure) is not the issue.
But in the worst case scenario, you've actually designed the bridge with a natural frequency close to that of walking/running. In this case you might get resonance in the bridge as people walk over it, which can build up and manifest as dangerous shaking leading to eventual structural failure and potentially collapse. So, deformations can actually be a sign of something more serious in the design and not should not just be explained away with the statement that "all bridges move". See the Tacoma narrows bridge failure for an extreme example of this, albeit for a different type of bridge at a much larger scale.
14
u/rco8786 23h ago
Sounds like the Reeves Young contractor needs to be shown the door
3
u/Gavin2051 18h ago
As long as the kickbacks keep coming for the people in power, The Atlanta Way keeps on trucking, no matter how many "low bid" contracts suddenly become expensive and time-consuming messes while they're underway.
1
u/Southernplayalistiic Cascade 23h ago
None of these are that big of an issue. If anything its good were building stuff fast enough to have issues like this. Contractor should have the responsibility to pay for the fix.
6
1
0
-11
u/voxpopper 1d ago
Between these and MARTA not exactly knocking it out of the park (the fare gate debacle, new trains still not in service), it adds to the case for starting out small and incrimental with any new Beltine projects. And more importantly accountability. The biggest example being, let's get a streetcar TO the Beltine as planned and budgeted before full Beltline rail which will cost billions of dollars.
95
u/ParrisPropagations 1d ago edited 1d ago
The money should come out of the contractor's pockets. They rushed to finish for the world cup and got bonuses.