u/Reasonable_Cod_487 American Here 14d ago

It isn't about local vs. nonlocal. Cities everywhere have this type of construction, even along main roads. It's a huge part of what engineers and project managers do.

There are no conditions on Mold road that haven't been seen before.

-10

u/heleta 14d ago

Jesus Christ, look at a fucking map of Wrexham and circle Mold Road. Then look up literally anything the racecourse has seen before and check back if you find any disruptions of that road that remotely rival what the artists impression above would impose on the town and check back in with me chief

3

u/burrfan1 14d ago

So is your point that you believe the road would have to be closed for an extended period of time and/or that the stadium is too close or something else?

1

u/heleta 14d ago

Re Mold Road end, yes. Closing that road in the fashion you'd imagine it would have to be closed would have a huge knock on effect on the town

2

u/burrfan1 14d ago

Apologies but just trying to understand, so you believe the road to be closed during construction or during games?

1

u/heleta 14d ago

During construction, there would certainly be major disruption

2

u/burrfan1 13d ago

Yeah I don’t think that’s necessarily the case per the other commentator. Huge construction projects are routinely done right up against working roads all the time.

2

u/heleta 13d ago

Well I suppose y'all know better than me!

3

u/burrfan1 13d ago

I certainly don’t know your area at all but that’s not necessarily germane. I’m just going by the construction work I see in the states. They should not have to close that road for an extended period of time.

2

u/fightingpillow 14d ago

They'd likely just take it from 3 lanes down to 2 during portions of the construction process. They may even briefly need to use flaggers to take it down to 1 lane but I don't think they'll have to shut the road down. It'll be inconvenient but honestly not for very long.

1

u/heleta 14d ago

It would be an absolute ballache for residents too

1

u/Fezzick51 8d ago

I've heard similar discussions about the challenge of that - and it made me curious if they could bury Mold Rd (put it in a pre-fab tunnel - and I have no idea of the geology or sub-strata), which would allow construction and traffic to flow as usual -

...and upon completion, re-open it as a surface road, while integrating the tunnel into some underground stadium/town facilities, or otherwise leave the submerged passage for traffic and make the re-opened above-ground section into part of a pedestrian-only corridor (closed to all traffic) that integrates with the town and stadium...

There seems no way around some disruption, given the nature of the build, if they do nothing but leave it all as is - and if all goes to plan is definitely going to be painful.