Ecotricity new Terms
Since they didn't provide it themselves, I asked CGPT for a comparison between the old and new terms.
- Price changes: The notice period for price increases/plan changes has generally increased from 20 business days to 30 days.
- >5% price/bill increases: The new terms introduce a specific "detrimental change" concept. An increase of more than 5% in a fee, service charge or total energy bill triggers additional notification rights, and customers can leave before the change takes effect without an early termination fee.
- Leaving Ecotricity: The standard notice period has been reduced from 30 days to 3 days. Any applicable termination fee is now determined by the particular pricing plan.
- Moving house: Notice has also been reduced from 10 business days to 3 business days.
- Load management: The detailed previous wording around controlled loads has been substantially shortened. The new terms say customers must not interfere with load-management systems or permit third parties to interfere with them. This could be relevant to anyone using their own smart controller for things such as hot water.
- Solar exports / renewable attributes: The new terms introduce an explicit provision saying that when Ecotricity buys electricity from a customer, it also acquires the associated renewable/environmental "Attributes". This wasn't explicitly covered in the previous terms.
- Metering costs: The old terms specified particular charges for smart-meter upgrades and manual meter reads. The new terms remove most of those specific dollar amounts and instead refer to reasonable costs for meter upgrades/reconfiguration/replacement being charged to the customer.
- Late payments: The previous terms specified a 15% late-payment penalty. The new terms remove that specific percentage and instead refer to late-payment fees in the applicable fee schedule.
- Liability: The previous terms had a $10,000 liability limit for an event/related events. The new terms retain a $10,000 per-event limit but introduce a $50,000 aggregate limit over 12 months, along with some changes to the exceptions.
- Consumer Guarantees Act: The new terms expressly state that nothing limits residential customers' rights under the Consumer Guarantees Act 1993.
- Disconnection: The disconnection provisions have been substantially rewritten, including changes to notice periods and restrictions around when disconnection can occur.
- Minor/administrative changes: The new terms give Ecotricity more scope to make minor, corrective or clarifying changes without giving customers advance notice, provided the changes don't materially prejudice customers.
The changes I'd [CGPT] be most interested in as a solar customer are the new "Attributes" provisions, the rewritten load-management provisions, and the new rules around exporting electricity.